• Cable Pulling

    2020 1 17 Manual Laying For manual pulling in of the cable one thing that must be ensured is that the cable is on no account pulled over the flange of the cable drum If the cable needs to be pulled in in sections due to local conditions no rings image 1 may be laid since this means that the cable is inappropriately twisted by 90 Combined with high forces of tension and various deflections

    Get Price
  • JOB SAFETY ANALYSIS

    2016 7 13 inhalation/skin hazards Specify the hazards and do not limit the description to a single word such as Caught ³ Aligning with the first two columns describe what actions or procedures are necessary to eliminate or minimize the hazards Be clear concise and specific Use objective observable and quantified terms

    Get Price
  • Risk Assessment

    2021 3 8 RISK ASSESSMENT CABLE PULLING LAYING GLANDING AND TERMINATION FROM RT BAY OUTDOOR ENCLOSURE TO RT CONTROL BUILDING docFree download as Word Doc doc PDF File Text File txt or view presentation slides online

    Get Price
  • Hazard Identification Risk Assessment Safe Working

    2014 8 13 Hazard Identification Risk Assessment Safe Working Large and awkward cable tray or ladder rack to be handled/carried by two operatives Avoid Manual Handling where possible 1 3 3 C P Engineering Services Ltd Ref 13 2 9 Rev 1 24/04/2014 Page 7 of 15

    Get Price
  • Hazard identification and risk assessment

    2021 4 3 Hazard identification and risk assessment Guidance Note Document No N 04600 GN1613A462124 Date 18/05/2020 Coreconcepts The aim of a robust hazard identification process is to ensure that the titleholder knows about existing well integrity hazards and the associated risks which could lead to a loss of integrity of the well

    Get Price
  • CHEMICAL RISK ASSESSMENT HAZARD CONTROL AND

    2019 7 1 JSA with PPE for Chemical Handling/Exposure A Job Safety Analysis JSA is one of the risk assessment tools used to identify and control workplace hazards ZDHC CMS3 6 Emergency Procedures Process/Plan for reducing Environmental Impact A process to identify and respond to potential chemical accidents

    Get Price
  • Electricity Cables

    Overhead Cables The principal hazard associated with overhead cables is of electrocution of plant operators This is often in the form of the excavators and cranes but tipping lorries have discharged the load and driving off site with the body still raised is a continuing source of injury

    Get Price
  • Commissioning Tests for HV Cables up to 33kV SWP

    2020 3 18 cable is designed and U is the r m s voltage between phases of the supply system for which the cable is designed Um is the highest voltage that can be sustained under normal operating conditions at any time For multi core cables the cores should be identified in one of the following ways

    Get Price
  • Risk Assessment cable Pulling Laying Glanding And

    CABLE PULLING LAYING IN CONFINED SPACE Cable pulling group Cable pulling group Cable pulling group Communication barriers among workers 3 2 6 Manual handling hazards 3 2 6 No available 4 2 8 confined space permit Revision 1 13 Jun 2013 use assign one man to

    Get Price
  • JOB SAFETY ANALYSIS

    2015 6 30 method for perform JSA into operational program selecting jobs 3 0 systems 50 controls 2 0 4 0 0 1 0 Q 0 I I Selection of tasks Prioritization of Hazards I Eliminate or control I Review the analysis t Step by step H Use of RSO for analysis tasks identification hazard 3 2 and potential 0 procedures 51 I

    Get Price
  • Jobs Safety Analysis JSA

    2019 4 18 Task Potential Hazards Controls Check deployment area Trip hazards cables hoses laying on the ground Unevenunstable ground Unsecured equipment Move and store any loose cables or hoses Mark or close off unstable areas set up railing Tie

    Get Price
  • 7 Easy Ways to Prevent Cable Related Dangers and

    Whether you re a parent business owner or pet lover reducing cable dangers and accidents with these 7 easy tips from CableOrganizer Protect children employees pets and customers from the hazards of loose cables and wiring with these easy to implement tasks

    Get Price
  • JOB SAFETY ANALYSIS

    2020 7 4 TASK POTENTIAL HAZARD RECOMMENDED ACTION/PROCEDURE Drilling near or around existing sewer lines Crossbore gas line installed through a sewer line A pre and/or post bore inspection may be needed All residential and commercial sewer lines must be located prior to beginning work Notify occupants about the gas line and ask them to call if they

    Get Price
  • Job Hazard Analysis

    2020 4 6 JOB SAFETY ANAYSIS JSA JOB TITLE Using Hand Tools Based on JHA from GLACIER DATE NEW REVISED JOB LOCATION DIISION BRANCH NAME OF EMPLYEE S INVOLVED IN ANALYSIS SUPERVISIOR DIVISION CHIEF REQUIRED AND OR RECOMMENDED PERSONAL PROTECTIVE EQUIPMENT PPE Goggles gloves mask back belt hearing protection

    Get Price
  • Job Hazard Analysis JHA

    2021 10 8 A job hazard analysis can be performed for all jobs in the workplace whether the job task is special non routine or routine Even one step jobs such as those in which only a button is pressed can and perhaps should be analyzed by evaluating surrounding work conditions

    Get Price
  • Hazard Identification Studies HAZID

    2018 10 29 Hazard identification HAZID is the process of identifying hazards which forms the essential first step of a risk assessment There are two possible purposes in identifying hazards To obtain a list of hazards for subsequent evaluation using other risk assessment techniques This is

    Get Price
  • Job Hazard Analysis

    JHA Job Hazard Analysis The process of breaking down the steps in a specific task job to identify all hazards or potential hazards that the individual performing the task job may be exposed to and control methods that can work to prevent or eliminate the risk of injury or illness

    Get Price
  • Step by Step Guide to Job Safety and Job Hazard Analysis

    The Occupational Safety and Health Administration OSHA requires formal hazard assessments for situations such as confined space work or when a job calls for Personal Protective Equipment PPE Conducting a Job Safety Analysis JSA is one way to meet these requirements and to make any dangerous job less risky

    Get Price
  • Risk Assessment for Installation of Cable Tray and

    2020 4 28 Cable Tray and or Trunking shall be kept on worksite/project undercover in dry well ventilated storage facilities/building 6 Where sizes of Cable Trays have not details on drawing then tray shall be appropriately sized to support the cables without bunching and a 25 reserve margin shall be permitted in size and weight to be loaded 7

    Get Price
  • Job Safety Analysis 14 For Cable Laying And Pulling

    HAZARDS INVOLVED 1 Work Permit Page 4 of 4 PJ247/JSA 14 REV 0 Cable laying/Pulling Related Documents Job Safety Analysis 14 For Cable Laying And Pulling October 2019 226 Method Statement For Cable Laying May 2020 17 Risk Assessment For Cable Laying December 2020 0 Jsa

    Get Price
  • Job Hazard Analysis

    2020 9 25 a job hazard analysis is and offers guidelines to help you conduct your own step by step analysis What is a hazard A hazard is the potential for harm In practical terms a hazard often is associated with a condition or activity that if left uncontrolled can result in an injury or illness See

    Get Price
  • Hazard identification and risk assessment

    2021 4 3 Hazard identification and risk assessment Guidance Note Document No N 04600 GN1613A462124 Date 18/05/2020 Coreconcepts The aim of a robust hazard identification process is to ensure that the titleholder knows about existing well integrity hazards and the associated risks which could lead to a loss of integrity of the well

    Get Price
  • Task Electrical Conduit Installation Job Hazard Analysis

    2018 9 6 Remove slip trip fall hazards from the work area if possible Complete hands on training from a journeyman prior to using power tools Clear work area of bystanders Evaluate materials to be drilled for potential hazards e g lead based paint chemcially treated wood etc 2 Bend conduit using conduit bender tool

    Get Price
  • Compagnie minière IOC

    2013 4 2 the cable and may contact workers if not properly secured Hazard Analysis/JSA/JHA Using the above discuss the work with the crew to understand the hazards associated with the work and how to mitigate them to prevent injury Title Microsoft PowerPointCable Pulling SPL Nov 15 2012

    Get Price
  • Attachment 1 Job Safety Analysis JSA for BGRR Canal

    2013 4 11 Prior to starting any job a tool box meeting will be held to discuss the work phases and review the entire job This includes identifying any hazards and discussing the safest way to complete the job while keeping the BNL populace safe and out of harm s way

    Get Price
  • Precautions in laying of Optical Fiber Communication

    2020 1 6 laying every cable drum shall be tested The normal length of drum is about 3 km The drum number length of the cable and running meters to be noted All fibers shall be tested with OTDR and traces to be stored The cable laying is avoided if any event or break is observed 6 5 Laying of OFC Cable There are basically two methods of laying OFC

    Get Price
  • Machine Safety Guidelines

    Fire Hazards Machine Shop Work Environment This above list is not exhaustive of all the hazards that may be present in machine shops or when working with machines Supervisors/PI must determine if there are any additional hazards that may be present This canbe achieved by completing a Job Safety Analysis JSA for tasks involved where

    Get Price
  • Job safety analysis Installing wall frames and roof

    2019 3 20 Electric shock check and tag power tools and cables regularly keep leads away from wet areas Falls from a height provide fall protection for heights of over 2 m ensure that all scaffolding and work platforms comply with AS/NZS 4576 or AS 6001 provide roof guard rails around roof edges wear protective non slip footwear

    Get Price
  • Electricity Cables

    Overhead Cables The principal hazard associated with overhead cables is of electrocution of plant operators This is often in the form of the excavators and cranes but tipping lorries have discharged the load and driving off site with the body still raised is a continuing source of injury

    Get Price
  • Attachment 1 Job Safety Analysis JSA for BGRR Canal

    2013 4 11 Prior to starting any job a tool box meeting will be held to discuss the work phases and review the entire job This includes identifying any hazards and discussing the safest way to complete the job while keeping the BNL populace safe and out of harm s way

    Get Price
  • Step by Step Guide to Job Safety and Job Hazard Analysis

    The Occupational Safety and Health Administration OSHA requires formal hazard assessments for situations such as confined space work or when a job calls for Personal Protective Equipment PPE Conducting a Job Safety Analysis JSA is one way to meet these requirements and to make any dangerous job less risky

    Get Price
  • Job Hazard Analysis vs

    2015 10 30 A job safety analysis JSA is a safety management technique that focuses on and is used to identify and control the hazards associated with a job or task JSAs ascertain the hazards existing

    Get Price
  • Hazard Analysis

    Workers who lay or set brick block or stone may face hazards from lifting and carrying manual materials handling Risk Description Lifting heavy materials while laying or setting brick block stone tile or marble can cause injury to muscles nerves discs and ligaments of the low back

    Get Price
  • CHEMICAL RISK ASSESSMENT HAZARD CONTROL AND

    2019 7 1 JSA with PPE for Chemical Handling/Exposure A Job Safety Analysis JSA is one of the risk assessment tools used to identify and control workplace hazards ZDHC CMS3 6 Emergency Procedures Process/Plan for reducing Environmental Impact A process to identify and respond to potential chemical accidents

    Get Price
  • JOB HAZARD ANALYSIS OF PIPE LAYING AND LIFTING

    2020 6 29 Home Safety JOB HAZARD ANALYSIS OF PIPE LAYING AND LIFTING JOB HAZARD ANALYSIS OF PIPE LAYING AND LIFTING Nadim Solanki June 29 2020 > Electrical equipment must be checked by a competent electrician and color coded Welding machine cable holder shall be inspected in good condition

    Get Price
  • ROCKY MOUNTAIN NATIONAL PARK JOB HAZARD

    2020 4 6 Preparing to move materials Unidentified and/or unmitigated hazards or unsafe conditions If at any point a job is deemed unsafe workers should feel entitled to stop until the appropriate PPE or equipment is available or the right conditions exists to make the job safe Consider all potential hazards weather wet or slippery

    Get Price
  • Job Description Hazard Identification Hazard Controls

    2016 8 2 JOB HAZARD ANALYSIS Reference 29 CFR 1926 Subpart Q Concrete and masonry construction OSHA Standard Job Description Hazard Identification Hazard Controls Laying out footing forms 1 Cutting form lumber with circular saw 1 High pitched noise can damage hearing a Saw operators and adjacent workers will wear hearing and eye protection when

    Get Price
  • JOB HAZARD ANALYSIS

    2016 8 2 the hazard of impalement Employee Instructions 1 Hard hats safety glasses high visibility vest work clothes work boots and gloves shall be worn at all times 2 This JHA must be reviewed with all workers prior to placing rebar All crew members must print/sign their name below to acknowledge their understanding of the JHA

    Get Price
  • CONCRETE MIXER SAFETY/RISK/HAZARD ASSESSMENT

    2021 7 20 Potential Hazard s Explosion or fire from fuel vapours Petrol model Risk Level Medium Control Measures Stop engine before refuelling Do not refuel while hot Avoid spillage of fuel when refuelling Ensure the fuel cap is properly secured after refuelling Carry out visual checks for fuel leaks and repair before operation

    Get Price
  • Commissioning Tests for HV Cables up to 33 kV Job

    2020 3 13 JSA SP0506R01 in particular stored charge in the cable under test manual handling hazards and electrical hazard associated with high voltage testing and correct earthing of cable and test equipment As identified in Carry Out Field Testing JSA SP0506R01 As identified in Carry Out Field Testing JSA SP0506R01 L